Drilling Power System Upgrade on Brage Field
December 15, 2024
Challenges
- Ensure the technical integrity of the Drilling Power System to support Brage’s extended operational lifetime.
- Execute a seamless upgrade within a tight timeline to avoid delays in drilling operations.
- Maintain excellent Health, Safety, and Environmental (HSE) standards during offshore installation.
Solutions
- Collaborative Partnership: Blueday Technology partnered with Head Energy Solve and Roxel Solutions to deliver a comprehensive upgrade.
- End-to-End Execution: Blueday Technology managed the design, production, installation, and commissioning of new Drilling Drive Panels.
- Robust Planning and Execution: Detailed planning ensured the upgrade was completed within the set timeline and aligned with Wintershall Norge’s operational requirements.
Results
- The project was successfully completed on time, enabling the re-start of drilling operations without disruption.
- The new Drilling Power System upgrade ensures long-term technical reliability, supporting Brage’s continued production.
- Recognition for Excellence: Wintershall Norge praised the team for delivering a solid, well-executed project while maintaining outstanding HSE performance.
Project Background
The Brage field, Wintershall Norge’s first operated production field, is located in the northern part of the North Sea, 125 kilometers west of Bergen, at a water depth of 137 meters. First oil was produced in 1993, with operatorship transitioning from Hydro to Statoil and eventually to Wintershall Norge in 2013.
Blueday Technology’s role in this upgrade reinforces the company’s commitment to delivering innovative and reliable solutions for complex offshore projects.