Port of Stavanger Installs BluEco® Shore Power System
December 16, 2024
Challenges
- Reduce greenhouse gas emissions, noise, and vibrations caused by docked vessels at the Port of Stavanger.
- Transition port operations to a greener profile in alignment with environmental and climate goals set by the owner municipalities.
- Provide a turnkey solution to meet the energy demands of Risavika terminal, supporting a high volume of annual port activity.
Solutions
- BluEco® Shore Power System: Delivered a modular, onshore power supply system to enable vessels to operate on clean electricity from the local grid while docked.
- Comprehensive Project Delivery: Blueday Technology managed all aspects of the project, including design, engineering, supply, installation, and commissioning.
- Proven Cleantech Expertise: Reinforced Blueday Technology’s role as a leader in maritime decarbonization and electrification.
Results
- Environmental Impact: Significant reductions in greenhouse gas emissions, noise pollution, and vibrations, improving local air quality and the living environment.
- Sustainable Operations: Supported the Port of Stavanger’s commitment to building a green profile through innovative and environmentally friendly port services.
- Enhanced Efficiency: Enabled docked vessels to power onboard systems sustainably, contributing to global maritime sector decarbonization efforts.
Client Background
The Port of Stavanger, a major logistics hub in Norway, handles approximately 50,000 port calls annually and is visited by close to 500,000 cruise passengers. With over 5,500 meters of quay and 680,000 m² of land, the port plays a vital role in social development and environmental sustainability for its owner municipalities.
Sustainability Impact
The BluEco® Shore Power System allows ships to power onboard systems, such as ventilation and cooling, using grid electricity instead of diesel engines. This transition supports EU legislation and aligns with the port’s strategy to minimize emissions, noise, and energy consumption, contributing to a cleaner and greener maritime sector.
Project Execution
Blueday Technology’s operating center in Stavanger successfully executed the turnkey project in 2024, meeting all deadlines and client expectations. The installation at Risavika terminal marks a milestone in the Port of Stavanger’s sustainability journey, reinforcing its leadership in eco-friendly port operations.